WeChat Mini Program · Energy Calculator

Save every kilowatt-hour.
Visible to all

Open the WeChat Mini Program "EnergyCalc" to view retrofit cases by system type, estimate energy savings, and discuss with peers whether a proposal is worth advancing.

  • Cases by System Type
  • Before and After Comparison
  • Energy Savings Reference Range
Energy Savings Calculator Community Mobile Interface: Case Study Cards and Pre- vs. Post-Retrofit Energy Comparison
Constant pressure retrofit for air compressor stationSample data

Pre-modification / Annual power consumption

19810,000 kWh

Post-renovation / Annual electricity consumption

16510,000 kWh

Energy savings as a percentage of pre-retrofit consumption16.7%
Save 33 MWh · ~16.7%

Before & After Measurement Comparison · Data is for illustration; actual energy savings are subject to project measurement reports.

The mini-program has four key features.

View cases, calculate energy savings, compare plans, and find peers—all within WeChat.

Retrofit Case Library

Compare energy consumption before and after upgrades by system type. See how similar projects were upgraded and calculate savings achieved.

Energy savings calculation

Enter device parameters and runtime to get a reference range for energy savings and costs.

Plan Comparison

Compare investment, energy savings, and payback period across multiple technology options.

Peer Exchange

Energy leads and service providers discuss proposal feasibility, data standards, and implementation details in the mini-program.

Featured Cases · Sample Data

Before and after changes are clear at a glance

Sample data
Factory Compressor Station and Piping SiteAir Compressor Station

Constant pressure retrofit of the air compressor station at an auto parts plant

Two industrial-frequency air compressors operate continuously with load/unload cycles, resulting in high pressure differential across the network and significant fluctuations in end-user demand.

Before Renovation

19810,000 kWh

Modified

16510,000 kWh

Savings
Save33 thousand kW·h
Payback Period
Payback Period1.8 years
Textile workshop steam condensate recovery pipelineSteam condensate

Closed-loop condensate recovery in textile mills

The dyeing workshop uses an open condensate recovery system, with flash steam discharged externally and return water temperature too low.

Before Renovation

9610,000 kWh

Modified

7910,000 kWh

Savings
Save17 thousand kW·h
Payback Period
Payback Period2.1 years
Food Plant Waste Heat Recovery Heat Exchange UnitWaste heat recovery

Waste heat recovery from air compressors for hot water production in food processing plants

Waste heat from the air compressor is directly vented, while hot water for plant disinfection and cleaning is supplied by an independent boiler.

Before Renovation

6410,000 kWh

Modified

5210,000 kWh

Savings
Save12 thousand kW·h
Payback Period
Payback Period1.6 years
Factory Variable Frequency Control Cabinet and Power Distribution RoomAir Compressor Station

VFD and Pipe Resistance Reduction in Electronics Manufacturing

Multiple units operate with decentralized control, resulting in numerous pipe bends and high pressure loss, causing sustained supply pressure to remain excessively high.

Before Renovation

14210,000 kWh

Modified

12110,000 kWh

Savings
Save21 thousand kW·h
Payback Period
Payback Period2.3 years
Steam Pipelines and Steam Traps Station in Chemical Industrial ParkSteam condensate

Retrofit of steam trap clusters in chemical industrial parks

Steam trap aging and leakage, multiple points of direct steam discharge, and localized damage to pipeline insulation.

Before Renovation

11810,000 kWh

Modified

10110,000 kWh

Savings
Save17 thousand kW·h
Payback Period
Payback Period1.4 years
Logistics Warehouse High-Bay Lighting Retrofit SiteMotors and Lighting

Efficient Motor and Lighting Retrofit for Logistics Warehouses

Old motors have low efficiency, high-position lights show significant lumen depreciation, and zoning control is missing.

Before Renovation

5810,000 kWh

Modified

4710,000 kWh

Savings
Save11 thousand kW·h
Payback Period
Payback Period1.9 years

Who is using Energy Calculator?

01

Head of Energy Management, Industrial Enterprise

Before making a decision, review real-world comparisons with similar systems to evaluate potential benefits and payback period.

02

Energy Service Providers and Engineers

Leverage proven technical approaches and data metrics to accelerate solution validation.

03

Government and Park Energy Conservation Authority

Understand the modernization paths and outcome presentation for different system types.

04

Industry Research & Investment Firms

Analyze the retrofit hotspots and energy savings distribution of the sub-system.

About

A team dedicated to energy-saving informatics.

Qidong Jiengneng SuanSuan Information Technology focuses on the industrial energy-saving sector by organizing information and managing a community. It consolidates scattered renovation experiences into searchable, comparable content and delivers it via the "Jineng SuanSuan" mini-program for use by energy consumers and service providers.

  • Information ServicesOrganize renovation case studies, technical roadmaps, and data standards.
  • Mini Program OperationsOrganize content and discussions around specific systems and projects.
  • Data OrganizationConsolidate energy usage records before and after the retrofit into a unified comparison format.

Open WeChat and scan the code to use

The mini-program QR code is pending. If you need to contact us for inquiries, case submissions, or partnership applications, please use the following methods.

  • Contact NumberTo be added
  • Business EmailTo be added
  • Company AddressQidong City, Jiangsu Province (detailed address to be added)

Mini program QR code pending

You can also search for "Energy Calculator" on WeChat to enter.

Frequently Asked Questions

Where does the case data in the mini program come from?+

Case studies are provided by the service providers and energy-using entities involved in the project, organized to show before-and-after comparisons. The values displayed on the page are illustrative; please verify them against official project measurement reports before formal use.

Can the calculation results be used directly as an investment basis?+

The calculated output provides a reference range to assess whether further validation is warranted. Actual energy savings must be confirmed through on-site measurements and equipment operating conditions.